I missed publishing a set of Pook-Emu Bee links yesterday. But that just means I have more links saved for today. If you enjoy the (almost) daily links and commentary, you can also follow via feed.

1. Qatar Wants to Bolster Security Partnership with US After Iran’s Strikes (Reuters [via gCaptain]. March 10, 2026.)

If so they should explain this to their local international TV outlet.

2. The joys of data centers: Debunking the backlash against the $7 trillion AI building boom (Christian Britschgi for Reason. April 2026 issue.)

The rest of us should be able to see the tremendous upsides of the country’s data center boom. Advances in artificial intelligence and robotics could liberate humanity from boring, backbreaking labor

The libertarians at Reason are smug now but I am not entirely convinced that AI cannot exude a smug sense of self-satisfaction while achieving nothing in the real world.

3. New All-Day Cafe LeTish Opening Soon in Williamsburg (Jennifer Rosini-Gentile for Greenpointers. March 9, 2026.)

I seldom eat or buy coffee “out” and have not been to Williamsburg in several months. Granting the foregoing, this place looks good.

4. Mamdani Condemns ‘White Supremacy’ Protest But Not Radical Islam After ISIS-Linked Bomb Attack (Jasmyn Jordan for Breitbart. March 9, 2026.)

All fair complaints. But imagine how insufferable he would have been had the two terrorists not explicitly spelled out their alleigance to ISIS. (Glass half-full take!)

5. Renovations on Carroll Gardens Library drag on (Mary Frost for Brooklyn Daily Eagle. March 9, 2026.)

I wrote about the library renovations back in 2024. My skeptecism about the timeline was well-founded.

6. Hobby Airport warns of 2-hour TSA wait due to government shutdown (Briahn Hawkins and Jillian Hartmann for Fox 26 Houston. March 8, 2026.)

I had a two hour wait at Houston Hobby last May. I used that time to wander around the airport Learning About William P. Hobby at Houston Hobby Airport and Failing to Try Airport Illy Coffee Vending Machine. Of course, my 2-hour wait was scheduled and everything was running on time. It sounds like things are going less swimmingly for travelers this March 2026.

7. How Usable Is Windows 98 In 2026? (Maya Posch for Hackaday. March 8, 2026.)

I would put this one in the “mileage may vary” category. With that being said, let it be said that I did several high school assignments on my Windows 95 in 2004 and 2005 and brought them to school on floppy disks.

I read an article about the completion of the renovation of the Brooklyn Public Library in Gerritsen Beach. Although I am a life-long resident of Brooklyn (NYC) and can point out Gerritsen Beach on a map, I have never stepped foot in the neighborhood, which has its own volunteer fire department owing to its relative isolation and narrow streets.

While I had not been previously aware that Gerritsen Beach has a public library, I wrote about the renovations of the Brooklyn Public Library branch in Carroll Gardens, Brooklyn, back in January 2024. According to my reporting (i.e., photographing the relevant signage outside the library), the renovations were projected to be complete within 18-24 months of July 23, 2023. We blew through the outer-limit of that projection nearly five months ago. I have noted on my walks that the Library is still closed, but I did not look into the reasoning. Fortunately, a syndicated copy of the report about the Gerritsen Beach library on Brownstoner included an update about the Carroll Gardens library in the related posts (plus-one for related post links). According to the May 27, 2025 report in Brownstoner:

Additional funding allocated by state Senator Andrew Gounardes last fall ensured all the required work would be done at once, and officials said the library would be finished in summer 2025. But crews from the city’s Department of Design and Construction recently determined that the building would need additional structural enforcements to support the weight of new high-energy HVAC units.

My original report noted that one goal of the renovation was to install a new HVAC system in the library. The new HVAC system proved to be more burdensome than originally expected. The report continues:

Now, according to BPL, DDC plans to wrap up in November 2025, at which point BPL will take over for some additional sprucing up — pushing the reopening date to summer 2026.

As I noted, I can confirm that the permanent Carroll Gardens Library (there is a temporary library in neighboring Cobble Hill) has not yet re-opened. We will see if the new summer 2026 estimate turns out to be accurate.